Leading multidisciplinary consultancy Pick Everard is working on the project at Wellingborough School on London Road, delivering architectural and civil engineering services alongside principal contractor Bowmer + Kirkland.
Though the project handover is set for the end of 2025, this is the first scheme in a much larger overarching transformation of the campus across the next 30 years.
The two and three storey building will feature new design and technology workshops, the largest lecture theatre on campus seating 220 students, as well as seminar rooms, office spaces, and computer lab connected by a large glass fronted modern reception.
The design and materials of the building have been closely collaborated on by Pick Everard and school stakeholders, helping mix the school’s heritage and history with modernity and innovation.
The project is targeting BREAAM Very Good for energy efficiency. Design has taken a fabric first approach with several sustainability aspects included such as PV roof panels, natural ventilation and thermal modelling performance measuring concurrent with construction to ensure optimum comfort levels for the occupiers and end users.
For more information on Pick Everard’s services, head to https://www.pickeverard.co.uk/